Before running the MicroStrategy crawler, you can run preflight checks to perform the necessary technical validations. The following preflight check will be completed:
Project permission
First, the list of projects in the Include Projects and Exclude Projects fields is determined. Next, the Get Projects REST API is used to fetch the actual list of projects for which the user has permissions.
✅ Check successful
if all the projects from the first list are in the second one.
❌ Check failed for $missingProjectId project